Project Details
- Location:
- Pecos, Texas
- Owner:
- Poolin
High-Density Compute Infrastructure:
60 MVA High-Density Compute Campus
- Designed a new 24.9kV substation with integrated medium-voltage fused switchgear to provide reliable distribution and protection.
- Includes 24 transformers (2,500 kVA each) stepping down from 24.9kV to 416V, delivering 60 MVA of capacity to support continuous, high-demand compute operations.
- Each transformer serves three 416V distribution feeds supporting 72 immersion-cooled mining tanks optimized for efficient thermal management and high compute density.
- Electrical infrastructure supports modular expansion and phased deployment, enabling rapid scalability and reliable 24/7 operation under sustained high electrical loads.